{"id":21814,"date":"2023-12-13T10:28:08","date_gmt":"2023-12-13T10:28:08","guid":{"rendered":"https:\/\/tecnol.es\/la-energia-renovable-como-motor-en-tecnol\/"},"modified":"2023-12-13T11:33:35","modified_gmt":"2023-12-13T11:33:35","slug":"renewable-energy-as-a-driving-force-at-tecnol","status":"publish","type":"post","link":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/","title":{"rendered":"Renewable energy as a driving force at TECNOL"},"content":{"rendered":"<h4>More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.<\/h4>\n<p>In TECNOL we are committed to the environment, as such, we have installed solar panels in several of the company&#8217;s warehouses. <strong>This allows us to supply ourselves prioritizing renewable energy, self-consumption and avoiding the emission of greenhouse gases.<\/strong><\/p>\n<p>At present, the buildings where TECNOL operates have <strong>three photovoltaic installations in operation:<\/strong><\/p>\n<ul>\n<li>At Guerau de Liost No. 11-13, for our offices.<\/li>\n<li>At Guerau de Liost No. 22, at the TECNOL Health factory.<\/li>\n<li>At the entrance to the subway parking lot of the new building, at Joan Fuster No. 15-23.<\/li>\n<\/ul>\n<p>In addition, as part of the <strong><a href=\"https:\/\/acepareus.es\/\">ACEPAR<\/a> <\/strong>project (Associaci\u00f3 Comunitat Energ\u00e8tica del Pol\u00edgon Agro-Reus), three more installations are under construction at our warehouses in the industrial park and at our new corporate headquarters. With the six photovoltaic installations in the different buildings, the total surface area is more than 10,300 m2.<\/p>\n<p>This initiative, approved by the <a href=\"https:\/\/www.miteco.gob.es\/es.html\"><strong>Ministry for Ecological Transition and the Demographic Challenge<\/strong><\/a>, will invest 4.4 million euros and will receive a significant subsidy through <strong>Next Generation funds.<\/strong><\/p>\n<p>At present, the annual electricity consumption of all the buildings where TECNOL operates is about 500 MWh\/year. With our growth forecast and the more than twenty electric car chargers already installed, this consumption will increase over the next few years. However, we do not expect to consume the <strong>1,389 MWh\/year generated by the photovoltaic installations<\/strong>. By virtue of being part of the Energy Community, we have been able to install more power than necessary. Thus, we are generating more energy than we consume and, therefore, we can share it with other companies in the industrial park and with households in vulnerable situations.<\/p>\n<p>In short, at TECNOL we prioritize sustainability and base our strategies on the recovery of resources, the improvement of production processes and waste management.<\/p>\n<p>&nbsp;<\/p>\n<h4>TECNOL with the environment<\/h4>\n<p>At TECNOL, since our origins we have worked oriented to produce the best solutions, always thinking about the <strong>environment and sustainability.<\/strong> From sustainable product lines such as solar lighting solutions or urban furniture built with recycled material, to, as in this case, the use and production of renewable energy.<\/p>\n<p>We support different projects by being partners of the <strong>UN Global Compact Spain<\/strong> and working in line with the <strong>Sustainable Development Goals<\/strong>. We have also achieved with our <a href=\"https:\/\/tecnol.es\/tecnol-celebra-los-25-anos-de-masergrup\/\">new corporate headquarters<\/a>, an intelligent and energetically autonomous building, different certifications that corroborate our commitment to the environment.<\/p>\n<p>We believe in a better future, and not only our products are designed for this future, but also our way of working and our business philosophy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses. In TECNOL we are committed to the environment, as such, we have installed solar panels in several of the company&#8217;s warehouses. This allows us to supply ourselves prioritizing renewable energy, self-consumption and avoiding the emission of greenhouse gases. At present, [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":21801,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[31,48],"tags":[],"class_list":["post-21814","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate","category-environment"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL<\/title>\n<meta name=\"description\" content=\"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL\" \/>\n<meta property=\"og:description\" content=\"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\" \/>\n<meta property=\"og:site_name\" content=\"TECNOL - GRUPO INDUSTRIAL GLOBAL\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/TQTecnol\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-13T10:28:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-13T11:33:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1712\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Medianeeds\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Medianeeds\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\"},\"author\":{\"name\":\"Medianeeds\",\"@id\":\"https:\/\/tecnol.es\/#\/schema\/person\/a9b1114bdff8cc574ae49d67f4ca6c88\"},\"headline\":\"Renewable energy as a driving force at TECNOL\",\"datePublished\":\"2023-12-13T10:28:08+00:00\",\"dateModified\":\"2023-12-13T11:33:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\"},\"wordCount\":441,\"publisher\":{\"@id\":\"https:\/\/tecnol.es\/#organization\"},\"image\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg\",\"articleSection\":[\"Corporate\",\"Environment\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\",\"url\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\",\"name\":\"Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL\",\"isPartOf\":{\"@id\":\"https:\/\/tecnol.es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg\",\"datePublished\":\"2023-12-13T10:28:08+00:00\",\"dateModified\":\"2023-12-13T11:33:35+00:00\",\"description\":\"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.\",\"breadcrumb\":{\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage\",\"url\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg\",\"contentUrl\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg\",\"width\":2560,\"height\":1712,\"caption\":\"fotovoltaicas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/tecnol.es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Renewable energy as a driving force at TECNOL\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/tecnol.es\/#website\",\"url\":\"https:\/\/tecnol.es\/\",\"name\":\"TECNOL - GRUPO INDUSTRIAL GLOBAL\",\"description\":\"Marca espa\u00f1ola l\u00edder en productos t\u00e9cnicos para la construcci\u00f3n y el mantenimiento urbano e industrial. M\u00e1s de 20 a\u00f1os de experiencia y m\u00e1s de 600 productos en nuestra web.\",\"publisher\":{\"@id\":\"https:\/\/tecnol.es\/#organization\"},\"alternateName\":\"Tecnol\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/tecnol.es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/tecnol.es\/#organization\",\"name\":\"TECNOL - GRUPO INDUSTRIAL GLOBAL\",\"alternateName\":\"Tecnol\",\"url\":\"https:\/\/tecnol.es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/tecnol.es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2024\/06\/Tecnol_GS.png\",\"contentUrl\":\"https:\/\/tecnol.es\/wp-content\/uploads\/2024\/06\/Tecnol_GS.png\",\"width\":829,\"height\":303,\"caption\":\"TECNOL - GRUPO INDUSTRIAL GLOBAL\"},\"image\":{\"@id\":\"https:\/\/tecnol.es\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/TQTecnol\",\"https:\/\/www.instagram.com\/tecnoltechnics\/\",\"https:\/\/www.linkedin.com\/company\/tq-tecnol-s-a-u\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/tecnol.es\/#\/schema\/person\/a9b1114bdff8cc574ae49d67f4ca6c88\",\"name\":\"Medianeeds\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/tecnol.es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/442251953f111b43a4668103c7b7c09aa35690e525473fb0bb9db0681ee9c0c3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/442251953f111b43a4668103c7b7c09aa35690e525473fb0bb9db0681ee9c0c3?s=96&d=mm&r=g\",\"caption\":\"Medianeeds\"},\"url\":\"https:\/\/tecnol.es\/en\/author\/medianeeds\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL","description":"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/","og_locale":"en_US","og_type":"article","og_title":"Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL","og_description":"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.","og_url":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/","og_site_name":"TECNOL - GRUPO INDUSTRIAL GLOBAL","article_publisher":"https:\/\/www.facebook.com\/TQTecnol","article_published_time":"2023-12-13T10:28:08+00:00","article_modified_time":"2023-12-13T11:33:35+00:00","og_image":[{"width":2560,"height":1712,"url":"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg","type":"image\/jpeg"}],"author":"Medianeeds","twitter_misc":{"Written by":"Medianeeds","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#article","isPartOf":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/"},"author":{"name":"Medianeeds","@id":"https:\/\/tecnol.es\/#\/schema\/person\/a9b1114bdff8cc574ae49d67f4ca6c88"},"headline":"Renewable energy as a driving force at TECNOL","datePublished":"2023-12-13T10:28:08+00:00","dateModified":"2023-12-13T11:33:35+00:00","mainEntityOfPage":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/"},"wordCount":441,"publisher":{"@id":"https:\/\/tecnol.es\/#organization"},"image":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage"},"thumbnailUrl":"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg","articleSection":["Corporate","Environment"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/","url":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/","name":"Renewable energy as a driving force at TECNOL - TECNOL - GRUPO INDUSTRIAL GLOBAL","isPartOf":{"@id":"https:\/\/tecnol.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage"},"image":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage"},"thumbnailUrl":"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg","datePublished":"2023-12-13T10:28:08+00:00","dateModified":"2023-12-13T11:33:35+00:00","description":"More than 10,300m2 of photovoltaic installations in TECNOL buildings to supply factories, offices and warehouses.","breadcrumb":{"@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#primaryimage","url":"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg","contentUrl":"https:\/\/tecnol.es\/wp-content\/uploads\/2023\/12\/IMG_20220824_102544-scaled.jpg","width":2560,"height":1712,"caption":"fotovoltaicas"},{"@type":"BreadcrumbList","@id":"https:\/\/tecnol.es\/en\/renewable-energy-as-a-driving-force-at-tecnol\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/tecnol.es\/"},{"@type":"ListItem","position":2,"name":"Renewable energy as a driving force at TECNOL"}]},{"@type":"WebSite","@id":"https:\/\/tecnol.es\/#website","url":"https:\/\/tecnol.es\/","name":"TECNOL - GRUPO INDUSTRIAL GLOBAL","description":"Marca espa\u00f1ola l\u00edder en productos t\u00e9cnicos para la construcci\u00f3n y el mantenimiento urbano e industrial. M\u00e1s de 20 a\u00f1os de experiencia y m\u00e1s de 600 productos en nuestra web.","publisher":{"@id":"https:\/\/tecnol.es\/#organization"},"alternateName":"Tecnol","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tecnol.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/tecnol.es\/#organization","name":"TECNOL - GRUPO INDUSTRIAL GLOBAL","alternateName":"Tecnol","url":"https:\/\/tecnol.es\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tecnol.es\/#\/schema\/logo\/image\/","url":"https:\/\/tecnol.es\/wp-content\/uploads\/2024\/06\/Tecnol_GS.png","contentUrl":"https:\/\/tecnol.es\/wp-content\/uploads\/2024\/06\/Tecnol_GS.png","width":829,"height":303,"caption":"TECNOL - GRUPO INDUSTRIAL GLOBAL"},"image":{"@id":"https:\/\/tecnol.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/TQTecnol","https:\/\/www.instagram.com\/tecnoltechnics\/","https:\/\/www.linkedin.com\/company\/tq-tecnol-s-a-u\/"]},{"@type":"Person","@id":"https:\/\/tecnol.es\/#\/schema\/person\/a9b1114bdff8cc574ae49d67f4ca6c88","name":"Medianeeds","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tecnol.es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/442251953f111b43a4668103c7b7c09aa35690e525473fb0bb9db0681ee9c0c3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/442251953f111b43a4668103c7b7c09aa35690e525473fb0bb9db0681ee9c0c3?s=96&d=mm&r=g","caption":"Medianeeds"},"url":"https:\/\/tecnol.es\/en\/author\/medianeeds\/"}]}},"_links":{"self":[{"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/posts\/21814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/comments?post=21814"}],"version-history":[{"count":2,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/posts\/21814\/revisions"}],"predecessor-version":[{"id":21816,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/posts\/21814\/revisions\/21816"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/media\/21801"}],"wp:attachment":[{"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/media?parent=21814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/categories?post=21814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tecnol.es\/en\/wp-json\/wp\/v2\/tags?post=21814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}